This project includes Washoe County staff hours and dollars expended for the operations and maintenance of the storm water facilities in the Tahoe Basin. The activities include ditch and pipe cleaning, DI/MH/sediment can cleaning and repair, AC berm/C&G repair and installation, pipe repair and installation, erosion control, shoulder repair, vegetation control and debris removal. Street Sweeping is reported under that project. Maintstar report with hours and staff costs were available for 2014. Pervious years are estimated.

Terminated
2007
2009
2014
$1,036,500

Dave Solaro (dsolaro@washoecounty.gov)
06/01/2014
09/07/2017
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

Organizations
Washoe County, NV (WACO) Dave Solaro - Washoe County, NV (WACO)

EIP Details

EIP Basics

01.01.02.0003 - Washoe County Storm Water Treatment Maintenance

Performance Measures

Expected Performance Measures

Expected Performance Measures

No expected performance measures set for this project.

Reported Performance Measures

Reported Performance Measures

No annual performance measure accomplishments entered for this project.


No accomplishments to report for:
Year(s) 2009, 2010, 2011, 2012, 2013, 2014
Explanation The project is for the O&M of storm water facilities in the Washoe County portion of the Tahoe Basin.

Funding

Expected Funding

Expected Funding
$1,036,500
$1,036,500
$0

Total
Unknown or Unassigned $1,036,500 $1,036,500 $0
Grand Total $1,036,500 $1,036,500 $0

Reported Expenditures

Reported Expenditures
Total 2014 2013 2012 2011 2010 2009 2008 2007
Washoe County General Fund $1,036,500 $216,500 $200,000 $180,000 $160,000 $140,000 $140,000 $0 $0
Grand Total $1,036,500 $216,500 $200,000 $180,000 $160,000 $140,000 $140,000 $0 $0

Photos

Photos

No photos available.

Other Details

Watersheds

Threshold Categories

Local and Regional Plans

No Local and Regional Plans set for this project.

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes
01/21/2016 2:04 PM Kris Klein All data in this project has been moved to Project # 06.01.03.0024 Stormwater Treatment Facilities Operations and Maintenance - Washoe County. No additional data should be added to this project, and future updates will be made to Project # 06.01.03.0024 Stormwater Treatment Facilities Operations and Maintenance - Washoe County.
05/21/2014 6:04 PM System There was 13 cubic yards of material removed from the drop inlets and sediment cans within the 2010 reporting period.
05/21/2014 6:03 PM System There were 51 labor hours and 26 equipment hours for this program within the 2010 reporting period.
05/21/2014 6:02 PM System There was 81 cubic yards of material removed from the drop inlets and sediment cans within the 2009 reporting period.
05/21/2014 6:01 PM System There were 301 labor hours and 157 equipment hours for this program within the 2009 reporting period