Lake Tahoe EIP

U.S. Highway 50 Corridor Collision Reduction Improvements – SR89 “Y” Junction to Pioneer Trail (SHOPP)

Project Number
03.02.02.0087
Action Priority
Build and Enhance Trail Networks
Implementers
California Department of Transportation
Supporting Agencies
California Department of Transportation
Primary Contact
Joan Davis (D3.FTIP@dot.ca.gov)

Stage
Planning/Design
Duration
2019 - 2027
Total Project Cost
$30,480,000
Funding Request
$0
Transportation Program Build and Enhance Trail Networks
In El Dorado County on US 50 in South Lake Tahoe from the US 50/SR 89 "Y" junction to Pioneer Trail (PM 75.4/80.0). Install roadway lighting, pedestrian hybrid beacons at mid-block crossing between Truckee Road and River Drive (PM 76.3), Brockway Avenue and Blue Lake Avenue (PM 77.0), and Herbert Avenue and Ski Run Boulevard (PM79.1)., improve bicycle signage throughout the project limit and install a two-stage que box for bike turning movement at multiple locations, add green bicycle lane treatments, enhance the visibility of crosswalks to improve safety for pedestrians and bicyclists, and install a full signalized intersection at Johnson Ave (PM78.8). EA 4H890

Targeted Performance Measures

No Expected Accomplishments provided

Threshold Categories

  • Recreation
US 50 and Brockway Ave Intersection 
(Timing: Before) (~89 KB)
Credit: Caltrans D3 US 50 and Brockway Ave Intersection

Location

Targeted Funding

Secured Funding: SHOPP Funds (Caltrans), $30,480,000

Photos

Before
US 50 WB Before Construction 
(Timing: Before) (~71 KB)
Credit: Caltrans D3
US 50 WB Before Construction

Project Fact Sheet Data as of 04/29/2024