South Tahoe Greenway - Upper Truckee Bridge at Johnson Meadow

Project Number
03.02.02.0085
Action Priority
Build and Enhance Trail Networks
Implementers
El Dorado County, CA, Tahoe Resource Conservation District
Supporting Agencies
Tahoe Regional Planning Agency, U.S. Federal Highway Administration
Primary Contact
Donaldo Palaroan (donaldo.palaroan@edcgov.us)

Stage
Planning/Design
Duration
2020 - 2027
Total Project Cost
$9,153,626
Funding Request
$8,288,846
Transportation Program Build and Enhance Trail Networks
The South Tahoe Greenway - Upper Truckee Bridge at Johnson Meadow Project will build upon the overall South Tahoe Greenway shared use path network through the south shore of Lake Tahoe. The Project aims to construct approximately 1.2 miles of a Class 1 shared use path and replacing a heavily trafficked bridge over the Upper Truckee River damaged by the 2017 winter storms. The Project will provide active transportation users a critical link to Barton Hospital from the west and the Tahoe Sierra neighborhood and the Lake Tahoe Community College to the east.

Targeted Performance Measures

  • Miles of Pedestrian and Bicycle Routes Improved or Constructed
  • Miles of Trails Developed or Improved

Threshold Categories

  • Recreation
Summer 2017, bridge not connected to West side
(Timing: Before) (~4,110 KB)
Credit: Tahoe Resource Conservation District Summer 2017, bridge not connected to West side

Location

Targeted Funding

Secured Funding: AQ Mitigation Funds (TRPA), $95,780

Secured Funding: Surface Transportation Block ... (FHWA), $769,000

Targeted Funding: AQ Mitigation Funds (TRPA), $675,346

Targeted Funding: California Active Transpo... (Caltrans), $6,113,500

Targeted Funding: Congestion Mitigation and Air... (FHWA), $1,000,000

Targeted Funding: Surface Transportation Block ... (FHWA), $500,000

Photos

Before
2017 winter, before runoff disconnected existing bridge
(Timing: Before) (~351 KB)
Credit: Tahoe Resource Conservation District
2017 winter, before runoff disconnected existing bridge
Sept 2020 photo from west bank of UTR towards existing bridge
(Timing: Before) (~943 KB)
Credit: El Dorado County
Sept 2020 photo from west bank of UTR towards existing bridge
Above existing concrete bridge, view towards the north/downstream
(Timing: Before) (~604 KB)
Credit: El Dorado County
Above existing concrete bridge, view towards the north/downstream

Project Fact Sheet Data as of 11/15/2024