Lake Tahoe EIP

U.S. 50 South Shore Community Revitalization Project

Project Number
03.02.01.0007
Action Priority
Build and Enhance Transit Systems
Implementers
Tahoe Transportation District
Supporting Agencies
California Department of Transportation, U.S. Federal Highway Administration, U.S. Federal Highway Administration, U.S. Federal Highway Administration, U.S. Federal Highway Administration, U.S. Federal Highway Administration, U.S. Federal Highway Administration, U.S. Forest Service - Lake Tahoe Basin Management Unit
Primary Contact
Judi Allen (jallen@tahoetransportation.org)

Stage
Planning/Design
Duration
2008 - 2040
Total Project Cost
$38,775,962
Funding Request
$0
Transportation Program Build and Enhance Transit Systems
The proposed project will make improvements to the US 50 corridor in the south Stateline area of Lake Tahoe by adding multi-use paths, sidewalks, pedestrian overcrossing, parking, and a roundabout at US50 and Lake Parkway intersection. The primary goal is to improve mobility, while balancing transportation needs with community goals of economic vitality and environmental preservation.

Targeted Performance Measures

  • Miles of Pedestrian and Bicycle Routes Improved or Constructed

Threshold Categories

  • Air Quality
Project Area Aerial Existing Conditions
(Timing: Before) (~1,253 KB)
Credit: unknown Project Area Aerial Existing Conditions

Location

Targeted Funding

Secured Funding: California Highway Infrastruc... (FHWA), $561,961

Secured Funding: Congestion Mitigation and Air... (FHWA), $1,041,000

Secured Funding: Federal Lands Highway Funding (FHWA), $1,970,000

Secured Funding: Public Lands Highways Discret... (FHWA), $1,133,431

Secured Funding: Southern Nevada Publi... (USFS - LTBMU), $3,020,000

Secured Funding: Surface Transportation Block ... (FHWA), $6,545,963

Secured Funding: Surface Transportation Block ... (FHWA), $81,840

Secured Funding: Toll Credits (Caltrans), $709,335

No Funding Source Identified

Photos

Before
Project Concept Drawing
(Timing: Before) (~2,614 KB)
Credit: TTD
Project Concept Drawing
Project Concept drawing
(Timing: Before) (~348 KB)
Credit: TTD
Project Concept drawing
Project concept drawing
(Timing: Before) (~3,356 KB)
Credit: TTD
Project concept drawing
Concept of proposed Project area improvements
(Timing: Before) (~1,208 KB)
Credit: TTD
Concept of proposed Project area improvements
Existing US 50 Photo looking North
(Timing: Before) (~1,089 KB)
Credit: TTD
Existing US 50 Photo looking North
US 50 Existing Bike/Ped facilities
(Timing: Before) (~1,155 KB)
Credit: TTD
US 50 Existing Bike/Ped facilities

Project Fact Sheet Data as of 06/06/2025