Lake Tahoe EIP

Montgomery Estates Area 2 Erosion Control Project

Project Number
01.01.01.0047
Action Priority
Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and Private Parcels
Implementers
El Dorado County, CA
Supporting Agencies
California Department of Water Resources, Tahoe Regional Planning Agency, U.S. Forest Service - Lake Tahoe Basin Management Unit
Primary Contact
Donaldo Palaroan (donaldo.palaroan@edcgov.us)

Stage
Completed
Duration
2008 - 2018
Total Project Cost
$967,086
Funding Request
$0
Stormwater Management Program Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and Private Parcels
Follow the preferred design approach for a residential erosion control project. Erosion source controls and stormwater treatment facilities associated with the roadway. Improvements will include revegetation of disturbed soils, drainage stabilization (e.g. paved gutters, rock lined channels), infiltration and sedimentation facilities (e.g. veg. treatment ponds and various sediment traps).

Targeted Performance Measures

No Expected Accomplishments provided

Threshold Categories

  • Soil Conservation
  • Water Quality
Montgomery Estates Area 2 Project Sign
(Timing: During) (~342 KB)
Credit: TRPA Montgomery Estates Area 2 Project Sign

Location

Targeted Funding

Secured Funding: Integrated Regional... (California DWR), $232,283

Secured Funding: Southern Nevada Publi... (USFS - LTBMU), $705,975

Secured Funding: WQ Mitigation Funds (TRPA), $28,828

Photos

During
Installation of diversion pipe to Columbine Basins
(Timing: During) (~121 KB)
Credit: El Dorado County
Installation of diversion pipe to Columbine Basins
After
Rock Toe Protect - Corner of Marshall Trail and Wagon Trail Trail
(Timing: After) (~764 KB)
Credit: El Dorado County
Rock Toe Protect - Corner of Marshall Trail and Wagon Trail Trail
Lower Columbine Basin
(Timing: After) (~2,502 KB)
Credit: El Dorado County
Lower Columbine Basin

Project Fact Sheet Data as of 05/07/2024