Kings Beach Watershed Improvement Project

Project Number
01.01.01.0045
Action Priority
Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and Private Parcels
Implementers
Placer County, CA
Supporting Agencies
California Department of Transportation, California Department of Transportation, California Department of Water Resources, North Tahoe Community Alliance, Placer County, CA, Tahoe Regional Planning Agency, Tahoe Regional Planning Agency, U.S. Forest Service - Lake Tahoe Basin Management Unit, U.S. Forest Service - Lake Tahoe Basin Management Unit
Primary Contact
Kevin Shifflet (kshifflet@placer.ca.gov)

Stage
Implementation
Duration
2007 - 2026
Total Project Cost
$8,662,710
Funding Request
$0
Stormwater Management Program Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and Private Parcels
Drainage conveyance stabilization, revegetation, road runoff treatment, and pavement of unpaved roadways in Kings Beach. This project was implemented through different phases including the Coon Street Clean Water Pipe, the Lower Chipmunk Project, and the Lower Secline Project. The Lower Secline project was completed in 2023 and included the paving of Lower Secline and Brockway Vista Ave which were unpaved or in poor condition in close proximity to the lake. The project included paving the existing dirt roads, stabilizing road shoulders, formalizing parking on unimproved surfaces and installing water quality improvements to reduce the quantity of sediment transport.

Targeted Performance Measures

No Expected Accomplishments provided

Threshold Categories

  • Soil Conservation
  • Water Quality
Basin for Coon Street Clean Water Pipe
(Timing: After) (~82 KB)
Credit: TRPA Basin for Coon Street Clean Water Pipe

Location

Targeted Funding

Secured Funding: California Departme... (California DWR), $2,270,367

Secured Funding: North Tahoe Community Allianc... (NTCA), $760,532

Secured Funding: Placer County General Fund (PLCO), $1,520,000

Secured Funding: SHOPP Funds (Caltrans), $45,000

Secured Funding: Southern Nevada Publi... (USFS - LTBMU), $2,671,494

Secured Funding: STIP Funds (Caltrans), $1,254,609

Secured Funding: Stormwater Fee (TRPA), $500,000

Secured Funding: U.S. Forest Service (USFS - LTBMU), $1,400,000

Secured Funding: WQ Mitigation Funds (TRPA), $381,889

Photos

During
Project Sign for Lower Chipmunk
(Timing: During) (~16,863 KB)
Credit: TRPA
Project Sign for Lower Chipmunk
After
Lower Chipmunk Outfall
(Timing: After) (~16,068 KB)
Credit: TRPA
Lower Chipmunk Outfall
Lower Secline and Brockway Vista post construction
(Timing: After) (~7,487 KB)
Credit: Placer County
Lower Secline and Brockway Vista post construction

Project Fact Sheet Data as of 04/30/2024