Lake Tahoe EIP

Nevada Stateline to Stateline Bikeway Laura Drive to Round Hill Pines Beach (Phases 1B, 1C, 1D)

Project Number
03.02.02.0053
Action Priority
Build and Enhance Trail Networks
Implementers
Tahoe Transportation District
Supporting Agencies
Unknown or unspecified
Primary Contact
Judi Allen (jallen@tahoetransportation.org)

Stage
Completed
Duration
2009 - 2016
Total Project Cost
$5,800,000
Funding Request
$0
Transportation Program Build and Enhance Trail Networks
This project will construct 2.5 miles of the Nevada Stateline to Stateline Bikeway on the South Shore including a new trail head with a restroom and parking lot at Kahle Drive. The paved trail will be construction in three phases: Phase 1B includes 1.1 miles of path from Kahle Drive through Rabe Meadow to Elks Point Road; Phase 1C includes 1.3 miles of path from Elks Point Road through USFS lands to Round Hill Pines Resort; Phase 1D includes 0.1 miles of path along Laura Drive (Kahle to 4H Road) where the road will be reconstruction to accommodate the path.

Targeted Performance Measures

No Expected Accomplishments provided

Threshold Categories

  • Air Quality
  • Recreation
Phase 1B Completed
(Timing: After) (~154 KB)
Credit: TTD Phase 1B Completed

Location

Targeted Funding

Secured Funding: Unknown or Unassigned, $5,800,000

Photos

During
Phase 1C Construction
(Timing: During) (~162 KB)
Credit: TTD
Phase 1C Construction
Phase 1D Project Sign
(Timing: During) (~1,956 KB)
Credit: Jeanne McNamara
Phase 1D Project Sign
After
Phase 1C Completed (2)
(Timing: After) (~165 KB)
Credit: TTD
Phase 1C Completed (2)
Phase 1C Nevada Stateline to Stateline Bikeway
(Timing: After) (~102 KB)
Credit: TRPA
Phase 1C Nevada Stateline to Stateline Bikeway

Project Fact Sheet Data as of 05/14/2024