Lake Tahoe EIP

Golden and Rainbow Fire Protection Water Infrastructure

Project Number
02.01.03.0022
Action Priority
Upgrade Priority Water Infrastructure to Fight Catastrophic Wildfire
Implementers
North Tahoe Public Utility District
Supporting Agencies
North Tahoe Public Utility District, U.S. Forest Service - Lake Tahoe Basin Management Unit
Primary Contact
Suzi Gibbons (sgibbons@ntpud.org)

Stage
Completed
Duration
2021 - 2023
Total Project Cost
$5,000,000
Funding Request
$5,000,000
Community Wildfire Protection Program Upgrade Priority Water Infrastructure to Fight Catastrophic Wildfire
The Tahoe Main water system in Kings Beach, CA is deficient in fire flows and in the number and spacing of fire hydrants and does not meet current fire codes on several streets in the grid. This project installed 7,700 linear feet of new 8-inch watermain in Golden Ave., Rainbow Ave., and upper Secline Street to replace the existing 1- and 2-inch diameter steel watermain that served the properties. Twelve new fire hydrants have been installed that are accessible from the public right of way. The project improved water supply enhancing fire protection capabilities on private, local, state, and federal lands by increasing fire flow volumes and coverage.

Targeted Performance Measures

No Expected Accomplishments provided

Threshold Categories

  • Vegetation Preservation

No Key Photo provided for this Project

Location

Targeted Funding

Secured Funding: Lake Tahoe Restoratio... (USFS - LTBMU), $1,683,492

Secured Funding: North Tahoe Public Utility D... (NTPUD), $3,316,508

Targeted Funding: Lake Tahoe Restoratio... (USFS - LTBMU), $2,500,000

Targeted Funding: North Tahoe Public Utility D... (NTPUD), $2,500,000

Photos

No additional photos provided


Project Fact Sheet Data as of 06/12/2025