Upgrade Priority Water Infrastructure to Fight Catastrophic Wildfire
Implementers
North Tahoe Public Utility District
Supporting Agencies
Primary Contact
Suzi Gibbons (sgibbons@ntpud.org)
Stage
Planning/Design
Duration
2022 - 2024
Total Project Cost
$5,281,000
Funding Request
$5,281,000
Community Wildfire Protection Program
Upgrade Priority Water Infrastructure to Fight Catastrophic Wildfire
The water system is comprised of watermains ranging from 2 inches to 8 inches in diameter. The system is deficient in fire flows and in the number and spacing of fire hydrants and does not meet current fire codes. The project would install 7,000 linear feet of new 8- and 10-inch diameter watermains to replace the existing less than 6-inch diameter watermains. Fifteen new fire hydrants would be installed that would be accessible from the public right of way. The new upsized watermains would also improve flow capacity of the existing intertie with Incline Village GID which is limited to 200 gpm. Flow and pressure to customers would be improved for those served by the 2-inch backyard mains.
Targeted Performance Measures
No Expected Accomplishments provided
Threshold Categories
Vegetation Preservation
No Key Photo provided for this Project
Location
Targeted Funding
Targeted Funding: Lake Tahoe Restoratio... (USFS - LTBMU), $2,000,000
Targeted Funding: North Tahoe Public Utility D... (NTPUD), $3,281,000