Upgrade Priority Water Infrastructure to Fight Catastrophic Wildfire
Implementers
North Tahoe Public Utility District
Supporting Agencies
Primary Contact
Suzi Gibbons (sgibbons@ntpud.org)
Stage
Planning/Design
Duration
2020 - 2025
Total Project Cost
$2,101,000
Funding Request
$2,101,000
Community Wildfire Protection Program
Upgrade Priority Water Infrastructure to Fight Catastrophic Wildfire
NTPUD owns the Lake Forest No. 3 water system which is located at the wildland urban interface in North Tahoe at the bottom of Dollar Hill. The water system is comprised of watermains ranging from 2 inches to 8 inches in diameter. The system is deficient in fire flows and in the number and spacing of fire hydrants and does not meet current fire codes. The project would install 3,000 linear feet of new 8- and 10- inch watermains to replace the existing 2- and 3-inch diameter steel watermains. Three new fire hydrants would be installed that would be accessible from North Lake Boulevard. The new upsized watermains would also be equipped with a connection point for an intertie with Fulton Water
Targeted Performance Measures
No Expected Accomplishments provided
Threshold Categories
Vegetation Preservation
No Key Photo provided for this Project
Location
Targeted Funding
Targeted Funding: Lake Tahoe Restoratio... (USFS - LTBMU), $1,050,500
Targeted Funding: North Tahoe Public Utility D... (NTPUD), $1,050,500