Lake Tahoe EIP

Rosewood Creek Continuation Project

Project Number
01.02.01.0076
Action Priority
Restore Priority Meadows, Wetlands, and Lake Tahoe Tributaries
Implementers
Nevada Tahoe Conservation District
Supporting Agencies
Nevada Tahoe Resource Team – Nevada Division of State Lands, U.S. Bureau of Reclamation
Primary Contact
Meghan Kelly (mkelly@ntcd.org)

Stage
Completed
Duration
2016 - 2023
Total Project Cost
$308,834
Funding Request
$0
Watershed Restoration Program Restore Priority Meadows, Wetlands, and Lake Tahoe Tributaries
The Rosewood Creek Continuation Project seeks to restore an area between two previously completed restorations on Rosewood Creek by constructing in channel grade controls using biostabilization and adding stormwater treatment where it is needed. The project's goals include improving water quality, riparian function, drought resilience, and terrestrial and aquatic habitat. The project completed water quality monitoring on Rosewood Creek that had been ongoing since 2002; the final report was submitted to the Bureau of Reclamation on September 30, 2023.

Targeted Performance Measures

  • Linear Feet of Stream Channel Restored or Enhanced

Threshold Categories

  • Fisheries
  • Vegetation Preservation
  • Water Quality
  • Wildlife
Installation of willow debris structures by GBI
(Timing: During) (~1,403 KB)
Credit: NTCD Installation of willow debris structures by GBI

Location

Targeted Funding

Secured Funding: Tahoe Bonds Act (NDSL), $22,742

Secured Funding: U.S. Bureau of Reclamation (USBOR), $286,092

Photos

Before
Directly connected stormwater outfall from SR 28
(Timing: Before) (~5,198 KB)
Credit: NTCD
Directly connected stormwater outfall from SR 28
The 250' below the SR28 culvert has headcuts and steep eroded banks
(Timing: Before) (~5,104 KB)
Credit: NTCD
The 250' below the SR28 culvert has headcuts and steep eroded banks
After
Willow Debris Structures designed to catch sediment and raise channel bed
(Timing: After) (~1,566 KB)
Credit: NTCD
Willow Debris Structures designed to catch sediment and raise channel bed
1 year later, willow structures
(Timing: After) (~1,482 KB)
Credit: NTCD
1 year later, willow structures

Project Fact Sheet Data as of 05/18/2024