Elks Club Drive Capital Overlay Rehabilitation Project
Project Number
01.01.01.0183
Action Priority
Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and Private Parcels
Implementers
El Dorado County, CA
Supporting Agencies
El Dorado County, CA
Primary Contact
Dan Kikkert (dan.kikkert@edcgov.us)
Stage
Completed
Duration
2017 - 2019
Total Project Cost
$1,000,000
Funding Request
$0
Stormwater Management Program
Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and Private Parcels
Pavement rehabilitation and new asphalt concrete overlay of Elks Club Drive from Boca Raton to Pioneer Trail were installed with this project. Included the construction of rolled curb and gutter from Pioneer Trail to Skyline drive which provides roadway widths for vehicles and bicycles, while eliminating sharp drop-offs at existing edge of road AC swales. The project established Elks Club Drive as a Class III bike route and allowed for a connection from the future Greenway Bike Trail Project. The Greenway is currently planned to cross Elks Club Drive near Boca Raton.
Targeted Performance Measures
Miles of Pedestrian and Bicycle Routes Improved or Constructed
Threshold Categories
Air Quality
Recreation
Water Quality
Paving of AC Swale
Location
Targeted Funding
Secured Funding: El Dorado County General Fund (ELDO), $1,000,000
Photos
Before
Elks Club at Skyline Drive - existing AC swale
Elks Club Drive - below Skyline with deep AC swale at edge of travelway