Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and Private Parcels
Implementers
El Dorado County, CA
Supporting Agencies
Unknown or unspecified
Primary Contact
Donaldo Palaroan (donaldo.palaroan@edcgov.us)
Stage
Completed
Duration
2006 - 2011
Total Project Cost
$1,211,487
Funding Request
$0
Stormwater Management Program
Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and Private Parcels
The Rubicon 5 Erosion Control Project (ECP) is one of the last ECP's within this region. There have been 7 ECP's built in this area: Victoria Drive, Rubicon (1-4), Mountain Drive, Woodland, Tamarack, Silvertip, and Lonely Gulch. The problems to be addressed with this project include the following:
a. Direct discharges of runoff into Lake Tahoe.Eroding cut slopes, drainages, and roadside ditches.
b. Road sand/cinder accumulation on roads and discharge into drainages.
c. Bare shoulders used as parking turnouts.
d. Inadequate Private BMPs.
Targeted Performance Measures
No Expected Accomplishments provided
Threshold Categories
Soil Conservation
Water Quality
Articulated Block Pad for infiltration - Rubicon Drive
Location
Targeted Funding
Secured Funding: Unknown or Unassigned, $1,211,487
Photos
After
Stormwater Chambers under parking area on Rubicon Drive