SLT Bikeway Realignment and Restoration at Link Road

Project Number
03.02.02.0109
Action Priority
Build and Enhance Trail Networks
Implementers
California Tahoe Conservancy
Primary Contact
Scott Cecchi (scott.cecchi@tahoe.ca.gov)
Stage
Planning/Design
Duration
2027 - 2031
Transportation Program Build and Enhance Trail Networks
Relocate a section of the South Lake Tahoe Bikeway out of the Upper Truckee Marsh and into the adjacent uplands in the vicinity of Link Road and create a direct connection to Sussex Avenue. This project will allow for significant SEZ and Wetland restoration and formalize a heavily trafficked native surface route that is much more direct. The existing alignment was intended to be temporary until acquisitions were completed.

Key Accomplishments

Accomplishments to be provided upon completion of project

Threshold Categories

  • Recreation
  • Scenic Resources
  • Vegetation Preservation
  • Water Quality
  • Wildlife
SLT Bikeway existing alignment and realignment concept in Link Road vicinity.
(Timing: Unknown) (~884 KB)
Credit: GIS map SLT Bikeway existing alignment and realignment concept in Link Road vicinity.

Location

Expenditures

No expenditures provided

Photos

Before
SLT Bikeway at Link Road. Spring 2023 inundation.
(Timing: Before) (~2,540 KB)
Credit: California Tahoe Conservancy
SLT Bikeway at Link Road. Spring 2023 inundation.
SLT Bikeway at Link Road in the Upper Truckee Marsh. Typical spring inundation.
(Timing: Before) (~278 KB)
Credit: California Tahoe Conservancy
SLT Bikeway at Link Road in the Upper Truckee Marsh. Typical spring inundation.
SLT Bikeway at Link Road. User-created trail to avoid flooded area and a significant detour.
(Timing: Before) (~623 KB)
Credit: California Tahoe Conservancy
SLT Bikeway at Link Road. User-created trail to avoid flooded area and a significant detour.

Project Fact Sheet Data as of 12/04/2024