Lake Tahoe EIP

Lake Tahoe Boulevard Class 1 Bicycle Trail (Viking Way to South Wye)

Project Number
03.02.02.0077
Action Priority
Build and Enhance Trail Networks
Implementers
City of South Lake Tahoe
Primary Contact
Stan Hill (shill@cityofslt.us)
Stage
Completed
Duration
2016 - 2023
Transportation Program Build and Enhance Trail Networks
Design and construct Class 1 bike trail, ADA compliant ramps, and pathway lighting along the 0.6 mile section of Lake Tahoe Blvd. from the Intersection of Viking Way (D-Street) to the intersection of State Hwy 89 and US Highway 50 (South Wye). Note: Project name was updated from "Viking Way to Lake Tahoe Blvd. Class 1 Bike Trail" on 11/23/16 for consistency with the name CSLT used to apply for CMAQ funds.

Key Accomplishments

  • Miles of Pedestrian and Bicycle Routes Improved or Constructed: 0.6 miles

Threshold Categories

  • Air Quality
  • Recreation
Preexisting Condition 1
(Timing: Before) (~1,036 KB)
Credit: Cardno Preexisting Condition 1

Location

Expenditures

Expenditures by Funding Source to Date: $5,201,848
(Estimated Cost: $5,334,941)
City of South Lake Tahoe Gene... (CSLT): $1,506,139

On Our Way (TRPA): $10,000

California Highway Infrastruc... (FHWA): $756,000

Congestion Mitigation and Air... (FHWA): $583,463

Surface Transportation Block ... (FHWA): $1,602,246

California Active Transpo... (Caltrans): $744,000

Photos

Before
Preexisting Condition 5
(Timing: Before) (~881 KB)
Credit: Cardno
Preexisting Condition 5
Preexisting Condition 4
(Timing: Before) (~886 KB)
Credit: Cardno
Preexisting Condition 4
During
Trail Construction (Looking toward South Wye Intersection)
(Timing: During) (~5,826 KB)
Credit: Mark Frisina
Trail Construction (Looking toward South Wye Intersection)
Trail Construction (Looking north in front of future Sugar Pine Village site)
(Timing: During) (~4,849 KB)
Credit: Mark Frisina
Trail Construction (Looking north in front of future Sugar Pine Village site)
After
CTC visits Lake Tahoe Blvd. Trail
(Timing: After) (~3,985 KB)
Credit: TRPA
CTC visits Lake Tahoe Blvd. Trail
Post Construction with Completed Streetlights
(Timing: After) (~4,002 KB)
Credit: Stan Hill
Post Construction with Completed Streetlights

Project Fact Sheet Data as of 04/26/2024