Lake Tahoe EIP

South Tahoe Greenway Shared Use Trail Phases 1b & 2

Project Number
03.02.02.0075
Action Priority
Build and Enhance Trail Networks
Implementers
El Dorado County, CA, California Tahoe Conservancy
Primary Contact
Donaldo Palaroan (donaldo.palaroan@edcgov.us)
Stage
Completed
Duration
2015 - 2022
Transportation Program Build and Enhance Trail Networks
Completed and open to the public in fall 2021, the South Tahoe Greenway Shared Use Trail Phases 1b & 2 is the second implementation phase of the entire Greenway project, now named the Dennis T. Machida Greenway Memorial Trail. It expands on the existing bicycle network and connections in South Lake Tahoe. The approximately one mile shared use trail between Glenwood Way and Sierra Blvd, includes an elevated boardwalk near Trout Creek and Bijou Creek. A new bike bridge over Trout Creek, improves local street crossings, and connectivity to nearby amenities.

Key Accomplishments

  • Miles of Pedestrian and Bicycle Routes Improved or Constructed: 1 miles

Threshold Categories

  • Air Quality
  • Recreation
Bridge and boardwalk at Trout Creek
(Timing: After) (~594 KB)
Credit: County of El Dorado Bridge and boardwalk at Trout Creek

Location

Expenditures

Expenditures by Funding Source to Date: $5,245,800
(Estimated Cost: $5,899,000)
California Active Transpo... (Caltrans): $1,928,000

California Tahoe Conservancy (CTC): $2,755,812

Congestion Mitigation and Air... (FHWA): $561,988

Photos

Before
Bijou Meadow alignment
(Timing: Before) (~7,200 KB)
Credit: Conservancy
Bijou Meadow alignment
Trout Creek bridge alignment
(Timing: Before) (~7,057 KB)
Credit: Conservancy
Trout Creek bridge alignment
After
Trail boardwalk
(Timing: After) (~993 KB)
Credit: CTC
Trail boardwalk
Dennis T. Machida Trail Trout Creek crossing
(Timing: After) (~615 KB)
Credit: TRPA
Dennis T. Machida Trail Trout Creek crossing

Project Fact Sheet Data as of 04/19/2024