Brook, Salmon, Yacht, and Dip Fire Protection Water Infrastructure

Project Number
02.01.03.0023
Action Priority
Upgrade Priority Water Infrastructure to Fight Catastrophic Wildfire
Implementers
North Tahoe Public Utility District
Primary Contact
Suzi Gibbons (sgibbons@ntpud.org)
Stage
Planning/Design
Duration
2026 - 2027
Community Wildfire Protection Program Upgrade Priority Water Infrastructure to Fight Catastrophic Wildfire
North Tahoe Public Utility District owns the Tahoe Main water system that serves the Kings Beach residential grid neighborhood. The water system is comprised of watermains ranging from 1- to 8- inches in diameter. The system is deficient in fire flows and in the number and spacing of fire hydrants and does not meet current fire codes on several streets in the grid. The project would install 2,650 linear feet of new 8-inch watermain on Brook, Salmon, Yacht, and Dip streets to replace the existing 1- and 2-inch diameter steel watermain that serves the properties. Five (5) new fire hydrants would be installed that would be accessible from the public right of way.

Key Accomplishments

Accomplishments to be provided upon completion of project

Threshold Categories

  • Vegetation Preservation

No Key Photo provided for this Project

Location

Expenditures

No expenditures provided