Bowers/Bijou Area Fire Protection Water Infrastructure

Project Number
02.01.03.0016
Action Priority
Upgrade Priority Water Infrastructure to Fight Catastrophic Wildfire
Implementers
South Tahoe Public Utility District
Primary Contact
Donielle Morse (dmorse@stpud.us)
Stage
Completed
Duration
2022 - 2022
Community Wildfire Protection Program Upgrade Priority Water Infrastructure to Fight Catastrophic Wildfire
STPUD deficiencies in fire flows and the number and spacing of fire hydrants did not meet current fire codes on several streets in the grid. The Bowers/Bijou Area is located within the South Tahoe Public Utility District service area. The properties on the street are served by undersized water mains (2 to 4 inches in diameter) and cannot support fire hydrants adequately for required fire suppression. Additionally, the number and spacing of fire hydrants do not meet current fire codes on several streets in the grid. These residential properties also have daily flow and pressure deficiencies. The project installed 10,400 feet of 8-inch water mains, improved system looping and added 15 new hydr

Key Accomplishments

Accomplishments to be provided upon completion of project

Threshold Categories

  • Vegetation Preservation

No Key Photo provided for this Project

Location

Expenditures

Expenditures by Funding Source to Date: $570,972
(Estimated Cost: $3,727,338)
Lake Tahoe Restoration Act (TRPA): $570,972

Photos

No additional photos provided


Project Fact Sheet Data as of 05/05/2024