Black Bart Area Fire Protection Water Infrastructure

Project Number
02.01.03.0015
Action Priority
Upgrade Priority Water Infrastructure to Fight Catastrophic Wildfire
Implementers
South Tahoe Public Utility District
Primary Contact
Donielle Morse (dmorse@stpud.us)
Stage
Completed
Duration
2019 - 2023
Community Wildfire Protection Program Upgrade Priority Water Infrastructure to Fight Catastrophic Wildfire
The Black Bart Project installed 7,700 linear feet of new 6-inch water main to replace the existing 1- and 2-inch diameter steel water main that serves the properties. Nine new fire hydrants would be installed that would be accessible from the public right of way. The project improves water supply enhancing fire protection capabilities on private, local, state, and federal lands by increasing fire flow volumes and coverage area.

Key Accomplishments

Accomplishments to be provided upon completion of project

Threshold Categories

  • Vegetation Preservation
Crews work to repair a water leak found during waterline installation on Black Bart
(Timing: Unknown) (~168 KB)
Credit: STPUD Crews work to repair a water leak found during waterline installation on Black Bart

Location

Expenditures

Expenditures by Funding Source to Date: $496,148
(Estimated Cost: $3,236,688)
Lake Tahoe Restoratio... (USFS - LTBMU): $496,148

Photos

No additional photos provided


Project Fact Sheet Data as of 05/05/2024