Lake Tahoe EIP

Crystal Peak Road - Watermain Replacement for Fire Protection

Project Number
02.01.03.0014
Action Priority
Upgrade Priority Water Infrastructure to Fight Catastrophic Wildfire
Implementers
Incline Village General Improvement District
Primary Contact
HUDSON KLEIN (hwk@ivgid.org)
Stage
Completed
Duration
2022 - 2023
Community Wildfire Protection Program Upgrade Priority Water Infrastructure to Fight Catastrophic Wildfire
Replacement of 2300 linear feet of 6-inch water main with new 8-inch water main and increase quantities of fire hydrants to meet 2018 IFC code requirements. This project is a continuation of the multi-year program to replace 1960's era thin wall steel water mains and other deficient water mains. We also work closely with the North Lake Tahoe Fire Protection District to determine areas of low fire flow, which may indicate a need for increased capacity in that area. Project improves water supply enhancing fire protection capabilities on private, local, state, and federal lands by increasing fire flow volumes and coverage area.

Key Accomplishments

Accomplishments to be provided upon completion of project

Threshold Categories

  • Vegetation Preservation
Design drawings1of9
(Timing: Before) (~943 KB)
Credit: IVGID Design drawings1of9

Location

Expenditures

Expenditures by Funding Source to Date: $1,364,528
(Estimated Cost: $1,324,433)
Incline Village General Impr... (IVGID): $1,160,000

Lake Tahoe Restoration Act (TRPA): $204,528

Photos

Before
IFC 9of9
(Timing: Before) (~1,821 KB)
Credit: IVGID
IFC 9of9
IFC 8 of9
(Timing: Before) (~2,635 KB)
Credit: IVGID
IFC 8 of9
During
General progress photo
(Timing: During) (~5,426 KB)
Credit: rdm
General progress photo
East project watermain tie-in location @ Martis Peak intersection w/Crystal Peak
(Timing: During) (~4,215 KB)
Credit: JEY
East project watermain tie-in location @ Martis Peak intersection w/Crystal Peak

Project Fact Sheet Data as of 05/05/2024