Upgrade Priority Water Infrastructure to Fight Catastrophic Wildfire
Implementers
North Tahoe Public Utility District
Primary Contact
Suzi Gibbons (sgibbons@ntpud.org)
Stage
Planning/Design
Duration
2024 - 2025
Community Wildfire Protection Program
Upgrade Priority Water Infrastructure to Fight Catastrophic Wildfire
The Tahoe Main water system in Kings Beach, CA is comprised of watermains ranging from 1- to 8- inches in diameter. The system is deficient in fire flows and in the number and spacing of fire hydrants and does not meet current fire codes on several streets in the grid. The project would install 2,700 linear feet of new 8-inch watermain on Trout Street to replace the existing 1- and 2-inch diameter steel watermain that serves the properties. Six new fire hydrants would be installed that would be accessible from the public right of way. Project improves water supply enhancing fire protection capabilities on private, local, state, and federal lands by increasing fire flow volumes and coverage.
Key Accomplishments
Accomplishments to be provided upon completion of project