Watersheds and Water Quality
Lake Tahoe EIP

Taylor Tallac Restoration Project – Sewer line relocation

Project Number
01.02.01.0103
Action Priority
Restore Priority Meadows, Wetlands, and Lake Tahoe Tributaries
Implementers
South Tahoe Public Utility District
Primary Contact
Donielle Morse (dmorse@stpud.us)
Stage
Planning/Design
Duration
2023 - 2026
Watershed Restoration Program Restore Priority Meadows, Wetlands, and Lake Tahoe Tributaries
The proposed project relocates 2200 LF of gravity sewer main from the current location along the Edge of Lake Tahoe to follow the edge of an existing roadway. The relocation reduces the risk of sewer discharge directly to Lake Tahoe by moving manholes currently located on the shore of Lake Tahoe (within a yellow cress protection area) and within tributaries away from these sensitive areas. Facilitates Taylor-Tallac Restoration by USFS.

Key Accomplishments

Accomplishments to be provided upon completion of project

Threshold Categories

  • Recreation
  • Water Quality
Proposed project relocates 2200 LF of gravity sewer main, which is currently located within SEZ to paved area and compacted road shoulder.  Reduces risk of sewer discharge directly to Lake Tahoe. 
(Timing: Before) (~2,840 KB)
Credit: Julie Ryan Proposed project relocates 2200 LF of gravity sewer main, which is currently located within SEZ to paved area and compacted road shoulder. Reduces risk of sewer discharge directly to Lake Tahoe.

Location

Expenditures

Expenditures by Funding Source to Date: $373,881
(Estimated Cost: $1,593,000)
U.S. Forest Service (USFS - LTBMU): $319,720

South Tahoe Public Utility D... (STPUD): $54,161

Photos

During
Site Survey 2024
(Timing: During) (~3,041 KB)
Credit: STPUD
Site Survey 2024
Baldwin Beach Site Walk April 2024
(Timing: During) (~1,523 KB)
Credit: STPUD
Baldwin Beach Site Walk April 2024
USFS Restroom served by existing gravity sewer.
(Timing: During) (~1,324 KB)
Credit: STPUD
USFS Restroom served by existing gravity sewer.
Baldwin Beach Access Road – Proposed gravity sewer alignment.
(Timing: During) (~1,297 KB)
Credit: STPUD
Baldwin Beach Access Road – Proposed gravity sewer alignment.
Potholing with hydro excavation unit (Vactor) to confirm line locations and depths.
(Timing: During) (~1,342 KB)
Credit: STPUD
Potholing with hydro excavation unit (Vactor) to confirm line locations and depths.
Review of station electrical equipment for rehab design work.
(Timing: During) (~845 KB)
Credit: STPUD
Review of station electrical equipment for rehab design work.
Learn more at restoretahoe.org

Project Fact Sheet Data as of 03/16/2026