Lake Tahoe EIP

Stormwater Treatment Facilities Operations and Maintenance – City of South Lake Tahoe

Project Number
01.01.02.0013
Action Priority
Operate and Maintain Stormwater Infrastructure
Implementers
City of South Lake Tahoe
Primary Contact
Jason Burke (jburke@cityofslt.us)
Stage
Implementation
Duration
2013 - 2045
Stormwater Management Program Operate and Maintain Stormwater Infrastructure
Annual Stormwater Treatment Facilities Operations and Maintenance – City of South Lake Tahoe.

Key Accomplishments

  • Acres of Forest Fuels Reduction Treatment: 16 acres

Threshold Categories

  • Water Quality
Dry Basin 1 - Glorene and 8th ECP before 2014 maintenance
(Timing: Before) (~2,789 KB)
Credit: Jason Burke Dry Basin 1 - Glorene and 8th ECP before 2014 maintenance

Location

Expenditures

Expenditures by Funding Source to Date: $446,823
(Estimated Cost: )
City of South Lake Tahoe Gene... (CSLT): $356,823

TRPA Operations & Maintenance... (TRPA): $90,000

Photos

Before
Al Tahoe ECP - Pasadena StormFilter vaults before 2013 cartridge replacement
(Timing: Before) (~94 KB)
Credit: Eric Friedlander
Al Tahoe ECP - Pasadena StormFilter vaults before 2013 cartridge replacement
Linear Pine Basin inlet (Stateline ECP) before 2014 maintenance
(Timing: Before) (~663 KB)
Credit: Jason Burke
Linear Pine Basin inlet (Stateline ECP) before 2014 maintenance
During
Fuel load reduction and trash cleanup - lower Tahoe Valley drainage (2015) 
(Timing: During) (~2,090 KB)
Credit: Jason Burke
Fuel load reduction and trash cleanup - lower Tahoe Valley drainage (2015)
Used needles and burnt spoons encountered during basin maintenance (2015)
(Timing: During) (~2,097 KB)
Credit: Jason Burke
Used needles and burnt spoons encountered during basin maintenance (2015)
After
Al Tahoe ECP - Pasadena StormFilter 2013 cartridge replacement AFTER
(Timing: After) (~117 KB)
Credit: Eric Friedlander
Al Tahoe ECP - Pasadena StormFilter 2013 cartridge replacement AFTER
Fuel loading and homeless encampments along bike path in SEZ/stormwater system after CCC clean up and fuel reduction (May 2015)
(Timing: After) (~2,387 KB)
Credit: Jason Burke
Fuel loading and homeless encampments along bike path in SEZ/stormwater system after CCC clean up and fuel reduction (May 2015)

Project Fact Sheet Data as of 04/25/2024