Lake Tahoe EIP

Cattlemans/Black Bart Retrofit Project

Project Number
01.01.01.0209
Action Priority
Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and Private Parcels
Implementers
El Dorado County, CA
Primary Contact
Dan Kikkert (dan.kikkert@edcgov.us)
Stage
Planning/Design
Duration
2024 - 2026
Stormwater Management Program Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and Private Parcels
The Cattlemans and Black Bart Basins were constructed as part of the Pioneer Trail III Erosion Control Project in 2001. The improvements included corrugated steel pipe outlet structures with atrium racks near the edge of the basin side slopes. Since construction the basins have become wet basins with the outlet structures now under water most of the year. The project will be focused on retrofit of the outlet pipes to so as discharge runoff above the existing basin surface water elevations allowing for proper inspections and maintenance related to runoff and sediment transport.

Key Accomplishments

Accomplishments to be provided upon completion of project

Threshold Categories

  • Water Quality
2001 - after construction looking north towards Cattleman's Basin from Cattlemans Court
(Timing: Before) (~671 KB)
Credit: El Dorado County 2001 - after construction looking north towards Cattleman's Basin from Cattlemans Court

Location

Expenditures

No expenditures provided

Photos

Before
2001 - After construction looking south towards Cattlemans Court.  Existing CSP Outlet structure is visible on left side of photo.
(Timing: Before) (~700 KB)
Credit: El Dorado County
2001 - After construction looking south towards Cattlemans Court. Existing CSP Outlet structure is visible on left side of photo.
2003 - Looking south towards Cattlemans Court.  Vegetation beginning to obscure CSP outlet.
(Timing: Before) (~1,873 KB)
Credit: El Dorado County
2003 - Looking south towards Cattlemans Court. Vegetation beginning to obscure CSP outlet.

Project Fact Sheet Data as of 05/05/2024