Lake Tahoe EIP

Osgood Basin Expansion

Project Number
01.01.01.0156
Action Priority
Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and Private Parcels
Implementers
City of South Lake Tahoe
Primary Contact
Stephen Anderjack (sanderjack@cityofslt.us)
Stage
Deferred
Duration
2019 - ongoing
Stormwater Management Program Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and Private Parcels
Retrofit of the existing undersized Osgood basin to reduce fine sediment particles and nutrients in a high-priority, directly-connected catchment that discharges direclty into the Ski Run Marina. Expansion of the basin to the east would require a higher berm, and proportionally larger footprint to overcome the challenges with the high groundwater table onsite. Alternative options may include a bypass to the Wildwood basins that would provide additional treatment once the the capacity of the currently undersized Osgood basin is exceeded. This project has been incorporated in the Upper Bijou Park Creek Project (EIP #01.01.01.0184).

Key Accomplishments

Accomplishments to be provided upon completion of project

Threshold Categories

No Threshold Categories provided
Existing Osgood SEZ area
(Timing: Before) (~1,011 KB)
Credit: Jason Burke Existing Osgood SEZ area

Location

Expenditures

No expenditures provided

Photos

Before
Wildwood basins
(Timing: Before) (~2,297 KB)
Credit: Jason Burke
Wildwood basins
Osgood Expansion Conceptual Layout
(Timing: Before) (~1,987 KB)
Credit: NHC
Osgood Expansion Conceptual Layout

Project Fact Sheet Data as of 11/16/2024