Bijou Area Erosion Control Project - Phase 1

Project Number
01.01.01.0019
Action Priority
Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and Private Parcels
Implementers
City of South Lake Tahoe
Primary Contact
Stan Hill (shill@cityofslt.us)
Stage
Completed
Duration
? - 2014
Stormwater Management Program Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and Private Parcels
The Bijou Area Erosion Control Project - Phase 1 will treat stormwater runoff from the Bijou commercial area, adjacent to Lake Tahoe. The Bijou Commercial Core is 47 acres of nearly 100% impervious area, including US Highway 50, commercial properties, and City roads. Project construction includes: (1) Construction of a regional treatment system for Commercial Core runoff which will be pumped through an underground force main to infiltration basins in the upper watershed; and (2) Replacement of the Bijou Creek storm drain system that conveys storm water runoff from the 1,300-acre Bijou Creek watershed, through the Commercial Core, to Lake Tahoe.

Key Accomplishments

  • Miles of Roads Decommissioned or Retrofitted: 0.54 miles

Threshold Categories

  • Scenic Resources
  • Soil Conservation
  • Vegetation Preservation
  • Water Quality
Bijou Project Sign near Fairway Drive
(Timing: During) (~3,246 KB)
Credit: TRPA Bijou Project Sign near Fairway Drive

Location

Expenditures

Expenditures by Funding Source to Date: $17,503,985
(Estimated Cost: $17,503,985)
South Tahoe Public Utility D... (STPUD): $348,736

WQ Mitigation Funds (TRPA): $264,386

California Departme... (California DWR): $188,991

Proposition 50 (CTC): $2,261,924

Proposition 84 (Lahontan) (Lahontan): $2,997,135

SHOPP Funds (Caltrans): $4,735,000

Southern Nevada Publi... (USFS - LTBMU): $6,707,813

Photos

Before
Bijou Outfall #1
(Timing: Before) (~682 KB)
Credit: Trevor Coolidge
Bijou Outfall #1
Bijou Creek Out to Lake
(Timing: Before) (~212 KB)
Credit: TRPA
Bijou Creek Out to Lake
During
Double Box Culvert Installation
(Timing: During) (~3,728 KB)
Credit: Trevor Coolidge
Double Box Culvert Installation
Trench Shoring 1
(Timing: During) (~2,984 KB)
Credit: Trevor Coolidge
Trench Shoring 1
After
Large Infiltration Basin in Snow
(Timing: After) (~3,237 KB)
Credit: Trevor Coolidge
Large Infiltration Basin in Snow
Bijou Oufall 
(Timing: After) (~3,540 KB)
Credit: Trevor Coolidge
Bijou Oufall

Project Fact Sheet Data as of 04/23/2024