Bijou Area Water Quality Improvement Project, Phases 2
Project Number
01.01.01.0160
Action Priority
Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and Private Parcels
Implementers
City of South Lake Tahoe
Primary Contact
Stan Hill (shill@cityofslt.us)
Stage
Planning/Design
Duration
2015 - 2026
Stormwater Management Program
Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and Private Parcels
Stabilize roadside shoulders as a means of sediment source control to protect the newly constructed Bijou ECP Phase 1 infiltration basins. Provide distributed infiltration as a form of hydrologic source control, acquire easements and install overflow conveyances where localized flooding results in excessive sediment tracking onto City road network, in order to improve roadway sweeping effectiveness and source control.
Key Accomplishments
Accomplishments to be provided upon completion of project
Threshold Categories
No Threshold Categories provided
Road condition impacts from inadequate drainage and need for source control - Glenwood Way
Location
Expenditures
Expenditures by Funding Source to Date: $10,000 (Estimated Cost: $1,000,000)
City of South Lake Tahoe Gene... (CSLT): $10,000
Photos
Before
Inadequate road drainage impacts ability to use achieve TMDL Road RAM scores - Glenwood Way
Inadequate road drainage and road shoulder stabilization - roadway flooding impacts ability to achieve TMDL Road RAM scores