Lake Tahoe EIP

Montgomery Estates Area 2 Erosion Control Project

Project Number
01.01.01.0047
Action Priority
Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and Private Parcels
Implementers
El Dorado County, CA
Primary Contact
Donaldo Palaroan (donaldo.palaroan@edcgov.us)
Stage
Completed
Duration
2008 - 2018
Stormwater Management Program Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and Private Parcels
Follow the preferred design approach for a residential erosion control project. Erosion source controls and stormwater treatment facilities associated with the roadway. Improvements will include revegetation of disturbed soils, drainage stabilization (e.g. paved gutters, rock lined channels), infiltration and sedimentation facilities (e.g. veg. treatment ponds and various sediment traps).

Key Accomplishments

  • Miles of Roads Decommissioned or Retrofitted: 3 miles

Threshold Categories

  • Soil Conservation
  • Water Quality
Montgomery Estates Area 2 Project Sign
(Timing: During) (~342 KB)
Credit: TRPA Montgomery Estates Area 2 Project Sign

Location

Expenditures

Expenditures by Funding Source to Date: $927,866
(Estimated Cost: $967,086)
Southern Nevada Publi... (USFS - LTBMU): $690,040

Integrated Regional... (California DWR): $204,996

WQ Mitigation Funds (TRPA): $32,830

Photos

During
Installation of diversion pipe to Columbine Basins
(Timing: During) (~121 KB)
Credit: El Dorado County
Installation of diversion pipe to Columbine Basins
After
Lower Columbine Basin
(Timing: After) (~2,502 KB)
Credit: El Dorado County
Lower Columbine Basin
Rock Toe Protect - Corner of Marshall Trail and Wagon Trail Trail
(Timing: After) (~764 KB)
Credit: El Dorado County
Rock Toe Protect - Corner of Marshall Trail and Wagon Trail Trail

Project Fact Sheet Data as of 04/23/2024