Lake Tahoe EIP

Central Incline Village Water Quality Improvement Project - Phase II

Project Number
01.01.01.0042
Action Priority
Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and Private Parcels
Implementers
Washoe County, NV
Primary Contact
Dave Solaro (dsolaro@washoecounty.gov)
Stage
Completed
Duration
2011 - 2016
Stormwater Management Program Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and Private Parcels
This project included small specific areas that were identified for water quality improvements as part of the Washoe County EIP Project Assessment completed in 2006. The areas are within project boundaries of several completed EIP projects however improvements for these areas were never included as part of the older projects. The problem areas were in need of source control, treatment and improved flow conveyance.

Key Accomplishments

  • Miles of Roads Decommissioned or Retrofitted: 3.06 miles

Threshold Categories

  • Soil Conservation
  • Water Quality
Stormwater Improvements Along Lakeshore Blvd.
(Timing: After) (~621 KB)
Credit: Tom Lotshaw Stormwater Improvements Along Lakeshore Blvd.

Location

Expenditures

Expenditures by Funding Source to Date: $2,455,770
(Estimated Cost: $2,455,770)
Southern Nevada Publi... (USFS - LTBMU): $1,192,121

Tahoe Bonds Act (NDSL): $1,263,649

Photos

Before
Infiltrating Galleries along Lakeshore Blvd.
(Timing: Before) (~385 KB)
Credit: Harold Stone
Infiltrating Galleries along Lakeshore Blvd.
Rock Line Ditch improvement at intersection of Rubicon Peak Lane and Lakeshore Boulevard 
(Timing: Before) (~2,892 KB)
Credit: William Holmes
Rock Line Ditch improvement at intersection of Rubicon Peak Lane and Lakeshore Boulevard
During
Infiltrating Galleries along Lakeshore Blvd.
(Timing: During) (~2,771 KB)
Credit: William Holmes
Infiltrating Galleries along Lakeshore Blvd.
Replacing old pipes with new pipes to increas conveyance to treatment system  
(Timing: During) (~2,793 KB)
Credit: William Holmes
Replacing old pipes with new pipes to increas conveyance to treatment system
After
Infiltrating Galleries along Lakeshore Blvd.
(Timing: After) (~2,133 KB)
Credit: William Holmes
Infiltrating Galleries along Lakeshore Blvd.
Three Infiltrating Basins in series to treat road runoff at Incline Way
(Timing: After) (~44 KB)
Credit: William Holmes
Three Infiltrating Basins in series to treat road runoff at Incline Way

Project Fact Sheet Data as of 04/23/2024