Christmas Valley Erosion Control Project - Phase 2A
Project Number
01.01.01.0029
Action Priority
Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and Private Parcels
Implementers
El Dorado County, CA
Primary Contact
Donaldo Palaroan (donaldo.palaroan@edcgov.us)
Stage
Completed
Duration
? - 2012
Stormwater Management Program
Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and Private Parcels
Project will be separated into 3-4 areas (a - residential, b - Industrial/DOT yards, c - Caltrans HWY 89 + Class 1 Bike Trail); Project will infiltrate and/or treat runoff from County and Caltrans right-of-way before it discharges into the Upper Truckee River. Stabilize eroding cut slopes with vegetation and/or rock protection; stabilize existing drainages with road and where feasible, with bio-engineering techniques; stabilize existing roadside drainages by installing curb and gutter or rock-lined channels and vegetated swales. Capture road sand/cinders and sediment in sediment trapping devices. Evaluate effectiveness of proposed improvements through preconstruction
Key Accomplishments
Miles of Roads Decommissioned or Retrofitted: 2.3 miles
Miles of Street Sweeping: 2.3 miles
Threshold Categories
Water Quality
No Key Photo provided for this Project
Location
Expenditures
Expenditures by Funding Source to Date: $1,080,700 (Estimated Cost: $1,080,700)