US Highway 50 Water Quality Improvement Project - Lake Tahoe Airport to US 50/SR 89 Junction
Project Number
01.01.01.0004
Action Priority
Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and Private Parcels
Implementers
California Department of Transportation
Primary Contact
Joan Davis (D3.FTIP@dot.ca.gov)
Stage
Completed
Duration
? - 2014
Stormwater Management Program
Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and Private Parcels
Near South Lake Tahoe, from entrance to South Tahoe Airport to Route 89. Reconstruct drainage system and construct stormwater improvements throughout project area. Incorporate erosion control measures on unvegetated slopes within the State right-of-way. Pave existing unsurfaced pullouts and driveway connections. Caltrans EA 1A732. Length 1.7 miles. Post mile 73.7 to PM 75.4.
Key Accomplishments
Miles of Pedestrian and Bicycle Routes Improved or Constructed: 0.51 miles
Threshold Categories
Water Quality
Installation of new drainage system.
Location
Expenditures
Expenditures by Funding Source to Date: $4,457,497 (Estimated Cost: $12,100,000)